4.5 Article

Optimal energy scheduling of a solar-based hybrid ship considering cold-ironing facilities

期刊

IET RENEWABLE POWER GENERATION
卷 15, 期 3, 页码 532-547

出版社

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/rpg2.12015

关键词

Cold; ironing; energy storage system; hybrid electric ship; optimal energy scheduling; solar generation system

向作者/读者索取更多资源

The use of a shipboard hybrid power system can reduce reliance on diesel generators by utilizing solar power and energy storage systems, with the added benefit of charging and discharging during berthing in ports. This results in decreased emissions, reduced costs, and increased profitability for the ship's energy supply.
There are many restrictions on shipping, which reduce or prohibit the use of diesel generators for feeding the energy demand of the electric ships, especially in ports. Therefore, the use of shore power system (SPS) together with renewable energies and energy storage systems (ESSs) can lead to many environmental benefits while ships are berthing in ports. In this study, the shipboard hybrid power system (HPS) is proposed, including diesel generators, solar photovoltaic panels (PV), ESS and cold-ironing (CI) facilities for using SPS to efficiently supply the ship's electrical demand. With such HPS aboard, the solar generated power is estimated accurately based on the navigation route. By optimal energy scheduling in a real hybrid cruise ship, the use of diesel generators gets minimised, due to the utilisation of PV and ESS. In addition, using CI service instead of switching on auxiliary diesel generators in ports leads to a 3 h increase in charging and discharging times of the ESS. Furthermore, the efficient use of CI service results in less use of diesel generators even at sailing hours, reducing emissions and minimising the costs of supplying ship's energy demand. The total cost reduction of the HPS in different case studies, without the use of CI services is only 1% to 2%, while this reduction is about 6% to 7% by adding the CI facilities to the HPS. Moreover, the economic characteristics of the proposed diesel-PV-ESS-CI by adding the CI facilities to the HPS are analysed and the profitability of this HPS in reducing the daily costs with considering the share of installation costs on the target day is proved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据