The importance of long-term well management in geothermal power systems using fuzzy control: A Western Anatolia (Turkey) case study

期刊

ENERGY
卷 213, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2020.118817

关键词

Geothermal power plant; Geothermal reservoir; Well management; Fuzzy control; Western anatolia

向作者/读者索取更多资源

Effective geothermal power generation depends on two main elements: geothermal reservoir management and maintenance of the power plant. Reservoir management consists of both the fluid production and reinjection of brine to the underground. The management of wells is important to ensure the sustainability of the reservoir. Thus, the flow rate control systems are essential to protect geothermal reservoirs under long-term power production. The second issue is the daily change in electricity prices and the load change process is complex because geothermal well controls are not flexible operations. The well management thus requires control approaches, and fuzzy control can be one effective solution. In this study, a fuzzy control system has been developed to control flow rates of the wells in Kizildere geothermal field and its performance has been compared with the real data taken from the Kizildere Power Plant. The results of comparison show that the fuzzy controllers achieved the target energy production in 2 h instead of 5 h, compared to the real data. Based on the real data, the reinjection was only able to stabilize at the end of the fourth hour and the process took only 2 h when using the fuzzy controllers. (C) 2020 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据