4.5 Review

Fundamentals and Physical Principles for Drilled Cuttings Transport-Cuttings Bed Sedimentation and Erosion

期刊

ENERGIES
卷 14, 期 3, 页码 -

出版社

MDPI
DOI: 10.3390/en14030545

关键词

cuttings removal; hole cleaning; drilling fluids

资金

  1. Research Council of Norway [294688]
  2. Equinor
  3. OMV

向作者/读者索取更多资源

Over time, operator companies have been researching and applying different hole cleaning techniques to improve cutting removal efficiency. However, there are issues with low efficiency, pipe sticking, and low rate of penetration.
The increasing necessity of challenging wellbore structures and drilling optimization for improved hole cuttings cleaning has been growing along time. As a result, operator companies have been researching and applying different hole cleaning techniques. Some of these are applied as traditional rules of thumb but are not always suitable for the new and up-coming challenges. This may result in inefficient hole cleaning, non-productive times, pipe stocking and low rate of penetration (ROP), among other problems. Here are presented some results and improvements for hole cleaning optimization obtained by the different research groups. The different authors mainly focus on specific cuttings transport parameters and sometimes combination of some of them. For this reason, there has not been a study that takes into account all of the different factors at the same time to accurately predict the cuttings bed height, formation and erosion, critical fluid velocity and properties and other key parameters. Consequently, there is a lack of understanding about the relation between different factors, such as the cohesiveness of the drilled cuttings with the different interstitial drilling fluids within the cuttings-bed. This relation can be analyzed establishing a wet-granular approach to obtain more efficient cuttings transport mechanism in challenging conditions.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据