4.7 Article

Building information modeling (BIM)-based modular integrated construction risk management-Critical survey and future needs

期刊

COMPUTERS IN INDUSTRY
卷 123, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.compind.2020.103327

关键词

Industry 4; 0; Digital technologies; Building information modeling (BIM); Modular integrated construction (MiC); BIM-based MiC risk management

资金

  1. Chinese National EngineeringResearch Centre for Steel Construction (Hong Kong Branch) at TheHong Kong Polytechnic University [1-BBV5]

向作者/读者索取更多资源

Modular integrated construction (MiC) is an innovative construction technology wherein complete building modules are produced and preassembled in an offsite factory before their final installation on the building site. It is fundamentally different from and has many advantages over the traditional onsite construction technology. However, it still involves several risks. To successfully implement MiC projects, effective MiC risk management (MiCRM) is crucial. Building information modeling (BIM) and BIM-related digital technologies have been applied to facilitate MiCRM in recent years. While numerous MiC studies exist, a critical analysis of BIM-based MiCRM is still missing. This study aims to conduct a critical survey of BIM-based MiCRM, and to offer recommendations about research gaps and future research directions. This was achieved by systematically identifying and critically reviewing related publications from four outlooks: (1) MiCRM through BIM used alone, (2) MiCRM through BIM used alongside sensing and tracking technologies (STTs), (3) MiCRM through BIM used alongside 3D model creation and comparison technologies (3D-MCCTs), and (4) other applications. Results indicated that using BIM alone for MiCRM has focused more on the design phase. The overall idea to use BIM-STTs integration for MiCRM is very young. In this direction, BIM-RFID integration has received most of the attention, although BIM-GIS integration is rarely explored. There are limited works around integrating BIM with 3D-MCCTs such as photogrammetry and augmented and virtual realities for MiCRM. While schedule-and cost-related risks have gained much attention in current BIM-based MiCRM research, facilities management, sustainability, and safety risks are largely ignored. Based upon identified gaps, this study suggested future research directions, including, e.g.: (1) BIM-based MiCRM software development, (2) fully automated and practical BIM-based MiCRM systems development, and (3) BIM-automatic rule checking integration for MiCRM. This study contributes to a solid understanding of BIM-based MiCRM and delivers a useful reference for its future practice and improvement within the industry. (c) 2020 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据