4.4 Article

A binary search algorithm for the general coupled task scheduling problem

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s10288-020-00463-w

关键词

Coupled task scheduling; Single machine; Minimizing makespan; Binary search; Heuristic; Bounds

资金

  1. UTS International Research Scholarship (IRS)
  2. UTS President's Scholarship (UTSP)
  3. Australian Research Council - Australian Government [DE170100234]
  4. Australian Research Council [DE170100234] Funding Source: Australian Research Council

向作者/读者索取更多资源

This paper investigates the coupled task scheduling problem, obtaining competitive lower bounds through procedures like solving 0-1 knapsack problems, proposing a binary search heuristic algorithm, and conducting computational experiments to demonstrate the effectiveness of the method. Results also show the proposed solution method outperforms the standard exact solver Gurobi.
The coupled task scheduling problem aims to schedule a set of jobs, each with at least two tasks and there is an exact delay period between two consecutive tasks, on a set of machines to optimize a performance criterion. We study the problem of scheduling a set of coupled jobs to be processed on a single machine with the objective of minimizing the makespan, which is known to be strongly NP-hard. We obtain competitive lower bounds for the problem through different procedures, including solving 0-1 knapsack problems. We obtain an upper bound by applying a heuristic algorithm. We then propose a binary search heuristic algorithm for the coupled task scheduling problem. We perform extensive computational experiments and show that the proposed method is able to obtain quality solutions. The results also indicate that the proposed solution method outperforms the standard exact solver Gurobi.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据