相关参考文献
注意:仅列出部分参考文献,下载原文获取全部文献信息。Performance of dowel beam-to-column connections for precast concrete systems under seismic loads: A review
Haider Hamad Ghayeb et al.
CONSTRUCTION AND BUILDING MATERIALS (2020)
Seismic performance of innovative hybrid precast reinforced concrete beam-to-column connections
Haider Hamad Ghayeb et al.
ENGINEERING STRUCTURES (2020)
Mechanical behaviour of grouted sleeve splice under uniaxial tensile loading
Zhiwei Lu et al.
ENGINEERING STRUCTURES (2019)
Seismic experimental study on a precast concrete beam-column connection with grout sleeves
Qiushi Yan et al.
ENGINEERING STRUCTURES (2018)
Tensile behavior of half grouted sleeve connections: Experimental study and analytical modeling
Huang Yuan et al.
CONSTRUCTION AND BUILDING MATERIALS (2017)
Development and testing of hybrid precast concrete beam-to-column connections under cyclic loading
Haider Hamad Ghayeb et al.
CONSTRUCTION AND BUILDING MATERIALS (2017)
Seismic Column-to-Footing Connections Using Grouted Splice Sleeves
M. J. Ameli et al.
ACI STRUCTURAL JOURNAL (2016)
Performance and confining mechanism of grouted deformed pipe splice under tensile load
Yongfeng Zheng et al.
ADVANCES IN STRUCTURAL ENGINEERING (2016)
Beam-column joints in continuous RC frames: Comparison between cast-in-situ and precast solutions
Marco Breccolotti et al.
ENGINEERING STRUCTURES (2016)
Tensile capacity of grouted splice sleeves
Jen Hua Ling et al.
ENGINEERING STRUCTURES (2016)
Seismic Performance of Precast Columns with Mechanically Spliced Column-Footing Connections
Zachary B. Haber et al.
ACI STRUCTURAL JOURNAL (2015)
Feasibility study of grouted splice connector under tensile load
Ling Jen Hua et al.
CONSTRUCTION AND BUILDING MATERIALS (2014)
Behaviour of grouted pipe splice under incremental tensile load
Jen Hua Ling et al.
CONSTRUCTION AND BUILDING MATERIALS (2012)
Experimental Study on the Bond Behavior of Reinforcing Bars Embedded in Concrete Subjected to Lateral Pressure
Feng Xu et al.
JOURNAL OF MATERIALS IN CIVIL ENGINEERING (2012)