4.6 Article

Is Anoxic Operation Effective to Control Nitrate Build-Up and Sludge Loss for the Combined Partial Nitritation and Anammox (CPNA) Process?

期刊

PROCESSES
卷 8, 期 9, 页码 -

出版社

MDPI
DOI: 10.3390/pr8091053

关键词

CPNA; start-up; nitrate build-up; sludge loss

资金

  1. Major Science and Technology Program for Water Pollution Control and Treatment of China [2017ZX07102, 2017ZX07102-003]
  2. Key Research and Development Program of Jiangxi Province [20171ACG70018]

向作者/读者索取更多资源

There were three main issues of long start-up period, nitrate build-up and sludge loss during the operation of combined partial-nitritation anammox (CPNA). To fully start up the CPNA reactor, the fast achievement of partial-nitritation (PN) was the first step. Firstly, the PN process was successfully achieved within 22 days by 2 mg.L(-1)hydroxylamine (NH2OH) addition and online intermittent aeration control at 0.2 similar to 0.3 mg.L(-1)dissolved oxygen (DO). Then, a novel strategy of adding anoxic stirring phase between feeding and aeration period during CPNA operation was applied. It was shown effective to control nitrate build-up since the mole ratio of NO3--N production and NH4+-N removed (MNRR) was mostly below 15%. Also, the procedure adjustment was proven useful to alleviate sludge loss by sustaining filamentous bacteria that could act as biomass framework and reduce nitrate substrate. The filamentous denitrifying bacteria could cause sludge bulking. The total nitrogen removal rate (TNRR) varied from 0.20 to 0.45 kg.m(-3).d(-1)during CPNA operation. In Stage III, after adding anoxic stirring phase, the abundance of nitrogen transformation functional microorganism's nitrite oxidizing bacteria (NOB) was below 1.6%, which was one order of magnitude lower than Anammox and ammonia oxidizing bacteria (AOB).

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据