4.6 Article

A novel multi-objective optimization algorithm for the integrated scheduling of flexible job shops considering preventive maintenance activities and transportation processes

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Computer Science, Artificial Intelligence

A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines

Mehdi Abedi et al.

EXPERT SYSTEMS WITH APPLICATIONS (2020)

Article Computer Science, Artificial Intelligence

Solving the multi-objective flexible job shop scheduling problem with a novel parallel branch and bound algorithm

Carlos Soto et al.

SWARM AND EVOLUTIONARY COMPUTATION (2020)

Article Green & Sustainable Science & Technology

An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns

Yufeng Li et al.

JOURNAL OF CLEANER PRODUCTION (2020)

Article Computer Science, Theory & Methods

An improved genetic algorithm for the flexible job shop scheduling problem with multiple time constraints

Guohui Zhang et al.

Swarm and Evolutionary Computation (2020)

Article Computer Science, Interdisciplinary Applications

Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization

Hugo Hissashi Miyata et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Article Computer Science, Interdisciplinary Applications

The flexible job-shop scheduling problem considering deterioration effect and energy consumption simultaneously

Xiuli Wu et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2019)

Proceedings Paper Computer Science, Artificial Intelligence

Dynamic priority based dispatching of AGVs in flexible job shops

Jens Heger et al.

12TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING (2019)

Article Computer Science, Artificial Intelligence

An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem

Maroua Nouiri et al.

JOURNAL OF INTELLIGENT MANUFACTURING (2018)

Article Computer Science, Artificial Intelligence

A Strength Pareto Evolutionary Algorithm Based on Reference Direction for Multiobjective and Many-Objective Optimization

Shouyong Jiang et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2017)

Article Computer Science, Artificial Intelligence

A Vector Angle-Based Evolutionary Algorithm for Unconstrained Many-Objective Optimization

Yi Xiang et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2017)

Article Engineering, Multidisciplinary

Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm

Sajad Karimi et al.

APPLIED MATHEMATICAL MODELLING (2017)

Article Computer Science, Interdisciplinary Applications

Hybrid artificial bee colony algorithm with a rescheduling strategy for solving flexible job shop scheduling problems

Xixing Li et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2017)

Article Computer Science, Artificial Intelligence

Flexible job shop scheduling under condition-based maintenance: Improved version of imperialist competitive algorithm

M. Zandieh et al.

APPLIED SOFT COMPUTING (2017)

Article Computer Science, Artificial Intelligence

An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting

Rong-Hwa Huang et al.

APPLIED SOFT COMPUTING (2017)

Article Computer Science, Artificial Intelligence

Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search

Hamidreza Maghsoudlou et al.

APPLIED SOFT COMPUTING (2017)

Article Computer Science, Interdisciplinary Applications

The Dual-Ants Colony: A novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance

Fatima El Khoukhi et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2017)

Article Computer Science, Artificial Intelligence

An artificial bee colony algorithm for multi-objective optimisation

Jianping Luo et al.

APPLIED SOFT COMPUTING (2017)

Article Computer Science, Interdisciplinary Applications

Simultaneous scheduling of machines and transport robots in flexible job shop environment using hybrid metaheuristics based on clustered holonic multiagent model

Houssem Eddine Nouri et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2016)

Article Computer Science, Interdisciplinary Applications

Heuristic approaches for scheduling jobs in large-scale flexible job shops

Oleh Sobeyko et al.

COMPUTERS & OPERATIONS RESEARCH (2016)

Article Computer Science, Artificial Intelligence

Robust job shop scheduling problem: Mathematical models, exact and heuristic algorithms

Amin Jamili

EXPERT SYSTEMS WITH APPLICATIONS (2016)

Article Computer Science, Artificial Intelligence

An object-oriented approach for multi-objective flexible job-shop scheduling problem

Vahit Kaplanoglu

EXPERT SYSTEMS WITH APPLICATIONS (2016)

Article Engineering, Industrial

Joint optimization of production scheduling and machine group preventive maintenance

Lei Xiao et al.

RELIABILITY ENGINEERING & SYSTEM SAFETY (2016)

Article Computer Science, Interdisciplinary Applications

The scheduling of maintenance. A resource-constraints mixed integer linear programming model

Riccardo Manzini et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2015)

Article Computer Science, Interdisciplinary Applications

Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate

Hadi Mokhtari et al.

COMPUTERS & OPERATIONS RESEARCH (2015)

Proceedings Paper Automation & Control Systems

A New Heuristic Method for Solving Joint Job Shop Scheduling of Production and Maintenance

N. Fnaiech et al.

IFAC PAPERSONLINE (2015)

Article Computer Science, Artificial Intelligence

ADEMO/D: Multiobjective optimization by an adaptive differential evolution algorithm

Sandra M. Venske et al.

NEUROCOMPUTING (2014)

Proceedings Paper Computer Science, Artificial Intelligence

Multi-objective Evolutionary Algorithm with Strong Convergence of Multi-area for Assembly Line Balancing Problem with Worker Capability

Wenqiang Zhang et al.

COMPLEX ADAPTIVE SYSTEMS: EMERGING TECHNOLOGIES FOR EVOLVING SYSTEMS: SOCIO-TECHNICAL, CYBER AND BIG DATA (2013)

Article Computer Science, Artificial Intelligence

Using the Averaged Hausdorff Distance as a Performance Measure in Evolutionary Multiobjective Optimization

Oliver Schuetze et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2012)

Article Mathematics, Applied

Scheduling open shops with parallel machines to minimize total completion time

B. Naderi et al.

JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS (2011)

Article Computer Science, Interdisciplinary Applications

An effective heuristic for flexible job-shop scheduling problem with maintenance activities

Shijin Wang et al.

COMPUTERS & INDUSTRIAL ENGINEERING (2010)

Article Computer Science, Theory & Methods

An artificial immune algorithm for the flexible job-shop scheduling problem

A. Bagheri et al.

FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE (2010)

Article Computer Science, Artificial Intelligence

Mathematical modeling and heuristic approaches to flexible job shop scheduling problems

Parviz Fattahi et al.

JOURNAL OF INTELLIGENT MANUFACTURING (2007)

Article Computer Science, Artificial Intelligence

Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm

Jie Gao et al.

JOURNAL OF INTELLIGENT MANUFACTURING (2006)

Article Computer Science, Artificial Intelligence

A fast and elitist multiobjective genetic algorithm: NSGA-II

K Deb et al.

IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION (2002)

Review Management

Scheduling with limited machine availability

G Schmidt

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2000)