4.7 Article

Less conservative results for stability of sampled-data systems with constant delay

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.jfranklin.2020.08.042

关键词

-

资金

  1. Basic Science Research Program through the National Research Foundation of Korea (NRF) - Ministry of Education [2020R1A6A1A12047945]
  2. Basic Science Research Program through the NRF of Korea - Ministry of Education, Science and Technology [2019R1I1A3A02058096]
  3. Brain Research Program through the National Research Foundation of Korea (NRF) - Ministry of Science, ICT & Future Planning [NRF-2017M3C7A1044815]
  4. National Research Foundation of Korea [2020R1A6A1A12047945, 2019R1I1A3A02058096] Funding Source: Korea Institute of Science & Technology Information (KISTI), National Science & Technology Information Service (NTIS)

向作者/读者索取更多资源

In this paper, the stability problem of the sampled-data system with communication delay is investigated. By construction with the functionals combining Lyapunov-Krasovskii functional and loop functionals, a less conservative result is derived in linear matrix inequalities. And then, by using the relations of state vectors belonging to augmented vectors and the integration between sampling times and communication delay in the system, several zero equalities are introduced. Based on the proposed result, improved stability criteria are investigated by using the zero equalities. Finally, some numerical examples are utilized to confirm the superiority and effectiveness of the results by comparing them with the existing ones. (C) 2020 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据