In situ recovery of copper sulfide ores: Alternative process schemes for bioleaching application

期刊

HYDROMETALLURGY
卷 196, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.hydromet.2020.105442

关键词

Copper Sulfide ores; Chalcopyrite ore; Bioleaching; Indirect bioleaching (IBL); In situ leaching (ISL); In situ recovery (ISR); In situ mining (ISM)

资金

  1. Conicyt Chile through the Conicyt-PIA Basal Project [AFB180004]

向作者/读者索取更多资源

There is a growing interest in exploring the application of bioleaching for treating copper sulfide ores of decreasing grade and located at larger depth by in situ recovery (ISR) for its potential savings in ore extraction, crushing, grinding and the avoidance of tailings. As copper sulfide ores are usually present in well consolidated rocks a crucial aspect for ISR to be successful is to increase the ore permeability in order to allow a good access of solution to the valuable metal values. However, in bioleaching an additional critical aspect is to guarantee an adequate supply of oxygen, the final electron acceptor in the reaction chain. Two alternative schemes to solve this issue are here characterized and compared using process simulation. One approach considers pre-treating the rock with hydrofracturing and/or confined blasting in order to create a network of cracks adequate for pumping the pressurized leaching solution into the ore bed in a saturated flow regime. In this scheme oxygen needs to be added in an external bioreactor where ferric iron is generated by bacterial oxidation of ferrous iron. A second approach considers pre-treating the ore by application of sublevel stopping techniques with partial removal of the rock to be able to irrigate the solution into the ore bed under an unsaturated flow regime. In this scheme oxygen can be directly supplied into the ore bed enabling in situ generation of ferric iron by the oxidative action of microorganisms present in the ore. The influence of irrigation rate, leaching solution concentration, bacterial population and ore bed dimensions on copper recovery and bioreactor requirements was assessed for these two process schemes. Some economic aspects of these two alternatives are discussed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据