A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 96, 期 -, 页码 180-191

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2016.03.023

关键词

Cross docking; Truck scheduling; Multi-objective optimization; Breakdown; Response surface methodology; Meta-heuristics

资金

  1. University of Tehran [8106043/1/27]

向作者/读者索取更多资源

This paper addresses a truck scheduling problem in a cross-docking center, in which trucks may confront breakdowns during their service times. In fact, the number of breakdowns in one unit of time for each truck follows a Poisson distribution function. On the other hand, customers are promised to receive required items in a pre-determined time; so, a due date is assigned to each outbound truck. Thus, a bi-objective linear mathematical model is developed inspired by models in the body of the respective literature. A complete enumeration method is employed to find optimum solutions subject to the complexity of large-scale problems, and we modify three multi-objective meta-heuristics; namely, Non-dominated Sorting Genetic Algorithm II (NSGA-II), Multi-Objective Simulated Annealing (MOSA) and Multi-Objective Differential Evolutionary (MODE). In addition, a Response Surface Methodology (RSM) as a statistical tool is used to find an appropriate amount of factors associated with the forgoing meta-heuristics. Finally, the performances of the proposed meta-heuristics are measured and compared with each other. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据