Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 290, 期 3, 页码 886-900

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2020.08.057

关键词

Job scheduling; Material ordering; Multistage stochastic programming; Endogenous uncertainties

向作者/读者索取更多资源

This paper introduces a stochastic approach for joint optimization of job scheduling and material ordering, with exact and approximate algorithms designed to solve the problem. The study shows that the approach can significantly reduce overall costs compared to traditional separate production planning methods.
Job scheduling incorporated with material ordering can better meet practical needs and lead to overall cost reduction. In this paper, we present a stochastic approach for this joint optimization problem, considering uncertainties in job processing times and resource consumptions. We formulate this integrated problem as a multistage stochastic mixed-integer program involving endogenous uncertainties. Several theoretical properties that can reduce the model size are studied. Based on this, a branch-and-bound exact algorithm and a sampling-based approximate method are designed as solution algorithms. The effectiveness of the integrated scheduling approaches and the efficiency of the proposed solution algorithms are evaluated via numerical experiments. It is shown that our approach can greatly reduce the overall cost compared with the traditional separate production planning approach, especially when production resources are not very restricted. (C) 2020 Elsevier B.V. All rights reserved.