4.6 Article

Actual performance analysis of a double shield TBM through sedimentary and low to medium grade metamorphic rocks of Ghomrood water conveyance tunnel project (lots 3 and 4)

期刊

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s10064-020-01947-z

关键词

TBM performance; Field penetration index; Penetration rate

向作者/读者索取更多资源

This paper analyzes the performance of a machine in excavating tunnels through sedimentary and low to medium grade metamorphic rocks in the Ghomrood water conveyance tunnel project. It proposes a prediction model based on the relationships between rock mass properties and machine performance parameters for future projects with similar geological conditions. Results show strong correlations between TBM performance and engineering geological conditions.
In this paper, after a brief description of engineering geological properties of Ghomrood water conveyance tunnel project (lots 3 and 4 with a total length of 18 km), the actual performance of the machine during the excavation of tunnel through sedimentary and low to medium grade metamorphic rocks has been analyzed. Subsequently, using data collected during pre-construction and construction phases of the project, the relationships between rock mass properties and measured machine performance parameters have been investigated and proposed as a prediction model which can be used in future projects in which similar geological conditions are encountered. Results of analyses indicated that there are strong relationships between TBM performance and engineering geological conditions of the tunnel alignment.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据