4.5 Article

A decision support tool for planning module installation in industrial construction

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Engineering, Civil

From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies

Zhen Lei et al.

CANADIAN JOURNAL OF CIVIL ENGINEERING (2015)

Review Construction & Building Technology

Automating motion trajectory Of crane-lifted loads

Jacek Olearczyk et al.

AUTOMATION IN CONSTRUCTION (2014)

Article Construction & Building Technology

A new approach for automation of location-based earthwork scheduling in road construction projects

Raj Kapur Shah

AUTOMATION IN CONSTRUCTION (2014)

Article Construction & Building Technology

A methodology for mobile crane lift path checking in heavy industrial projects

Zhen Lei et al.

AUTOMATION IN CONSTRUCTION (2013)

Article Construction & Building Technology

A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects

Ning Dong et al.

AUTOMATION IN CONSTRUCTION (2013)

Article Construction & Building Technology

A framework for an automated and integrated project scheduling and management system

Shih-Ming Chen et al.

AUTOMATION IN CONSTRUCTION (2013)

Article Construction & Building Technology

Automated construction sequencing and scheduling from functional requirements

David K. H. Chua et al.

AUTOMATION IN CONSTRUCTION (2013)

Article Construction & Building Technology

Simulation-Based Auction Protocol for Resource Scheduling Problems

H. Taghaddos et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2012)

Article Computer Science, Artificial Intelligence

Bridge construction schedule generation with pattern-based construction methods and constraint-based simulation

I-Chen Wu et al.

ADVANCED ENGINEERING INFORMATICS (2010)

Article Computer Science, Artificial Intelligence

Knowledge-based schedule generation and evaluation

Eva Mikulakova et al.

ADVANCED ENGINEERING INFORMATICS (2010)

Article Construction & Building Technology

A formal identification and re-sequencing process for developing sequencing alternatives in CPM schedules

Bonsang Koo et al.

AUTOMATION IN CONSTRUCTION (2007)

Article Management

Experimental investigation of heuristics for resource-constrained project scheduling: An update

Rainer Kolisch et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2006)

Article Construction & Building Technology

Optimization algorithm for selection and on site location of mobile cranes

M Al-Hussein et al.

JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT (2005)

Article Computer Science, Interdisciplinary Applications

A genetic algorithm for the vehicle routing problem

BM Baker et al.

COMPUTERS & OPERATIONS RESEARCH (2003)

Article Construction & Building Technology

A virtual construction environment for preconstruction planning

AF Waly et al.

AUTOMATION IN CONSTRUCTION (2003)

Article Computer Science, Interdisciplinary Applications

Automated path planning for mobile crane lifts

HR Reddy et al.

COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING (2002)