4.7 Article

Analysis of tower foundation stability along the Qinghai-Tibet Power Transmission Line and impact of the route on the permafrost

期刊

COLD REGIONS SCIENCE AND TECHNOLOGY
卷 121, 期 -, 页码 205-213

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.coldregions.2015.06.015

关键词

Power transmission line; Re-freezing process of foundation soils; Foundation displacement; Thermosyphon; Permafrost

资金

  1. National Natural Science Foundation of China [41171059]
  2. National Key Basic Research Program of China (973 Program) [2012CB026106]
  3. Program for Innovative Research Group of Natural Science Foundation of China [41121061]
  4. Science and Technology Project of State Grid Corporation [DYYGYSQT (2012)8]
  5. Fund of State Key Laboratory of Frozen Soil Engineering [SKLFSE-ZY-16]

向作者/读者索取更多资源

The Qinghai-Tibet Power Transmission Line (QTPTL), crossing about 550 km permafrost regions, was constructed between July 2010 and October 2011. Based on 4 years of field observations since the construction, thermal and displacement performances of tower foundations in permafrost regions along the QTPTL were analyzed. The observational results from 10 monitored towers showed that the re-freezing process of foundation soils of deeply embedded pile foundations largely took 2 to 3 months. While for shallowly-buried footings, it took one to two cold seasons due to the significant thermal impacts of the foundation construction. After the re-freezing, the thermal regimes of foundation soils mainly determined by the thermosyphon cooling and enhanced heat transfer process of the concrete foundation. With the thermosyphon cooling, foundation soils around and under tower foundations cooled significantly and cold bulbs developed under tower foundations. But for shallowly-buried footings without thermosyphon, the maximum thaw near the footings could be as much as 2.0 m greater than that in the natural ground due to enhanced heat transfer process of the concrete footings. Foundation displacement observations at 130 monitored towers showed that the majority of tower foundations suffered subsidence rather than heave during the observational period. The subsidence was considerable in warm, ice-rich permafrost regions. After the tower assembling and line hanging, the subsidence rate of most of tower foundations decreased substantially. Up to the present, all 130 monitored tower foundations had the accumulative subsidence within an allowable range. Experiences and lessons learned from the QTPTL. will be of value for future similar constructions in permafrost regions. (C) 2015 Elsevier B.V. All rights reserved.