4.7 Article

Techno-economic and performance evaluation of energy production by anaerobic digestion in Brazil: bovine, swine and poultry slaughterhouse effluents

期刊

JOURNAL OF CLEANER PRODUCTION
卷 277, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.jclepro.2020.123332

关键词

Biogas; Renewable energy; Economic viability; Circular economy

资金

  1. Brazilian National Council for the Improvement of Higher Education (CAPES)
  2. Brazilian National Council of Scientific and Technological Development (CNPq)

向作者/读者索取更多资源

This work describes anaerobic treatment system modeling, using up- flow anaerobic sludge blanket reactors (UASB) reactors, aiming at biogas energy use, under hydraulic retention times (HRT) of 12, 24, 48, 120 and 240 h, from bovine (slaughter capacity: less than 20, 20 to 40, 40 to 80 and more than 80 heads.h(-1)), swine (less than 80, 80 to 200, 200 to 400, 400 to 800 and more than 800 heads.d(-1)) and poultry (less than 600, 600 to 1500, 1500 to 3000 and more than 3000 heads.h(-1)) slaughterhouse effluents. To techno-economic potential evaluate, four scenarios were designed using the combination of maximum and minimum values for the installation of the treatment system (reactors) and the generator system. The scenarios were applied for all classes of slaughterhouses throughout HRTs established under two project concepts: i) full implementation of the treatment and generator systems and; ii) partial implementation, only the generator system. Economic viability analyzes were performed using Net Present Value (NPV), Internal Rate of Return (IRR) and Minimum Attractive Rate of Return (MARR) criteria. In scenario 1, using minimum unit values for the treatment system (USD 43.23.m(-3)) and the generator set (USD 287.80.KW-1) and HRT of up to 48 h, all bovine, swine and poultry slaughterhouse classes presented potential and economic viability for energy generation, with gains of up to USD 831.462.78 to bovine slaughterhouse, USD 91.977.88 to swine slaughterhouse and USD 179.150.63 to poultry slaughterhouse. The scenarios 2 and 4 result in unviability for al simulations. The scenario 3 result in viability under specific conditions of implementation (total and/or partial); HRT (12, 24, 48 h and sporadically 120); In 24-h HRT show negatives IRRs; and attractive ratio criteria (use of IRR as MARR). In simulated conditions of scenario 1 the techno-economic analysis is HRT of 24 h and HRT of 12 h in scenario 3, both with the need for post-treatment systems. HRTs of 120 and 240 h were found to be infeasible due to system size and costs involved, as well as a non-significant increase in energy generation when compared to lower HRTs. (C) 2020 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据