期刊
APPLIED THERMAL ENGINEERING
卷 174, 期 -, 页码 -出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.applthermaleng.2020.115202
关键词
Reconstruction of cooling tower; Natural draft dry cooling tower; Cooling performance; Cooling system optimization
资金
- National Natural Science Foundation of China [51606112]
Natural draft dry cooling tower is attractive in recent decades with its superiority of zero water loss. Some old thermal power plants are under high pressure of waste water reducing emission, thus the natural draft wet cooling tower is obsoleted. Reconstructing natural draft wet cooling tower into natural draft dry cooling tower is attractive for the saving of capital expenditure. But it has not been researched before, this study aims to fill this gap. Based on an actual reconstruction case, the operation mode of reconstructed dry cooling system is established and relevant MATLAB programming is realized, which is validated by literature data. The reconstructed system consists of two reconstructed natural draft dry cooling towers, a usual natural draft dry cooling tower and two 660 MW power units. The cooling capacity of reconstructed natural draft dry cooling tower is lower through thermal characteristic comparison with the usual natural draft dry cooling tower. In order to realize the optimal operation, different water distribution schemes are presented and several operation parameters are analyzed. Under the optimized reconstruction design, the annual water saving and annual cost are discussed. The annual water saving is about14.49 million metric tons that is about 8.86 million dollars and the minimum annual cost is about 181.47 million dollars, which brings great economic and environmental benefits.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据