4.2 Article

Capturing different perspectives on integrated urban water management issues

期刊

WATER POLICY
卷 22, 期 2, 页码 252-275

出版社

IWA PUBLISHING
DOI: 10.2166/wp.2020.200

关键词

Barriers; Enabling environment; Integrated urban water management; Water infrastructure planning

向作者/读者索取更多资源

Integrated urban water management (IUWM) involves a complex web of organisational interactions. Each organisation has its own priorities and unique perceptions of problems. This study offers two contributions to the research on this topic. First, 14 major issues in IUWM infrastructure planning were determined through industry consultation and a literature review. Second, an industry survey investigated which issues were most important to which organisations, and results show significant differences across organisational types. While there were significant differences between organisational types, the survey found that across the entire sector, most issues were ranked similarly in importance with two clear outliers, collaboration and integration being clearly the most important and post-evaluation the least. If the industry can develop an understanding of these differences in organisational perspectives, it will provide a starting point for better collaboration in integrated water infrastructure planning processes.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据