4.7 Article

Gravel packing: How does it work?

期刊

PHYSICS OF FLUIDS
卷 32, 期 5, 页码 -

出版社

AMER INST PHYSICS
DOI: 10.1063/5.0001607

关键词

-

资金

  1. NSERC
  2. Schlumberger through CRD Project [505549-16]
  3. UBC through the 4YF program

向作者/读者索取更多资源

Oil and gas wells undergo completion operations before being able to produce. In the case where the surrounding reservoir is poorly consolidated, a popular method is open hole gravel packing. This proceeds by pumping a sand suspension along the annular region between the borehole wall and a cylindrical screen, sized to allow hydraulic conductivity but to prevent the passage of sand. Kilometers of sand can be successfully placed in horizontal wells, in what is called alpha-beta packing. Although widely used, there is no clear and concise explanation of how these operations work, i.e., How does a steady (and apparently stable) traveling alpha-wave emerge? We develop such a model and explanation here. We explain how bed height is selected via coupling between the inner and outer annuli and from the combined hydraulic relations of inner and outer annuli. We investigate the effects of important parameters such as the slurry flow rate, mean solid concentration, washpipe diameter, and leak-off rate on gravel packing flows, to give a fluid mechanics framework within which this process can be easily understood. Published under license by AIP Publishing.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据