4.6 Article

Performance evaluation of TEDA impregnated activated carbon under long term operation simulated NPP operating condition

期刊

NUCLEAR ENGINEERING AND TECHNOLOGY
卷 52, 期 11, 页码 2652-2659

出版社

KOREAN NUCLEAR SOC
DOI: 10.1016/j.net.2020.04.020

关键词

Air cleaning unit; TEDA-Impregnated activated carbon; Methyl iodide penetration test; Long-term operation; Semi-plant scale test facility; Methyl iodide removal performance

资金

  1. Korea Hydro & Nuclear Power Co., Ltd. [L16S054000]

向作者/读者索取更多资源

The methyl iodide (CH3I) removal performance of tri-ethylene-di-amine impregnated activated carbon (TEDA-AC) used in the air cleaning unit of nuclear power plants (NPPs) should be maintained at least 99% between 24 month-performance test period. In order for evaluating the effectiveness of TEDA-AC on the removal performance of CH3I in nuclear power plant during the operation of NPPs, the long-term test for up to 15 months was carried out under the simulated operating conditions (e.g., 25 degrees C, RH 50%, ppb level poisoning gases injection) at nuclear power plants (NPPs). The TEDA-AC samples were analyzed with the Brunauer-Emmett-Teller (BET) specific surface area and TEDA content as well as CH3I penetration test. It is clearly evident that more than 99% of CH3I removal performance of TEDA-AC was observed in the TEDA-AC samples during 15 months of long-term operation under the simulated NPP operating conditions including the ppb level of organic and oxide form of poisoning gases. BET specific surface area and TEDA content that can affect the CH3I removal performance of TEDA-AC were also maintained as those in new TEDA-AC during 15 months of long-term operation. (C) 2020 Korean Nuclear Society, Published by Elsevier Korea LLC.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据