4.7 Article

Floating constructed wetland for the treatment of polluted river water: A pilot scale study on seasonal variation and shock load

期刊

CHEMICAL ENGINEERING JOURNAL
卷 287, 期 -, 页码 62-73

出版社

ELSEVIER SCIENCE SA
DOI: 10.1016/j.cej.2015.10.118

关键词

Macrophyte; Nutrients; Organics; Pollution control; Treatment wetland

资金

  1. NGO Forum for Public Health, Bangladesh

向作者/读者索取更多资源

This paper reports the performance of a pilot scale floating constructed wetland (FCW), employed for the treatment of polluted water collected from Buriganga river in Bangladesh. The FCW system included a tank for accommodating collected water and a floating mat with media, to support the growth of two macrophyte species Phragmites australis and Canna indica. Mean mass removal rates of 0.66, 0.76, 0.08, 0.51, 2.49 g/m(2) d were achieved for ammoniacal nitrogen (NH4-N), total inorganic nitrogen (TIN), phosphorus (P), biochemical oxygen demand (BOD), chemical oxygen demand,(COD), respectively by the FCW. Nitrogen removal was via nitrification-denitrification processes, whereas filtration-sedimentation appeared to influence phosphorus removal. The system achieved substantial Escherichia coli mortality rates, through protozoa predation and oxidation processes. Higher influent concentrations during dry period allowed greater removal of nutrients and E. coli. Hydraulic shock-loading experiment revealed critical interdependency between hanging roots maturity, input hydraulic, and pollutant loadings for maintaining stable performances. (C) 2015 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据