4.7 Article

Combined heat and power units and network expansion planning considering distributed energy resources and demand response programs

期刊

ENERGY CONVERSION AND MANAGEMENT
卷 211, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.enconman.2020.112776

关键词

Expansion planning; District heating; Distributed energy resources; Demand response programs, Electricity transaction

资金

  1. FEDER funds through COMPETE 2020
  2. Portuguese funds through FCT [POCI-01-0145-FEDER-029803 (02/SAICT/2017)]

向作者/读者索取更多资源

This paper addresses a hierarchical framework for the energy resources and network expansion planning of an Energy Distribution Company (EDC) that supplies its downward Active Industrial MicroGrids (AIMGs) with hot water and/or steam and electricity through its district heating and electric grid, respectively. The main contribution of this paper is that the proposed model considers AIMGs' electricity transactions with each other and/ or other customers through the EDC's electric main grid and investigates the impacts of these transactions on the expansion planning problem. The solution methodology is another contribution of this paper that tries to trade-off between accuracy and computational burden. The proposed framework uses a three-stage iterative heuristic optimization algorithm that considers different uncertainties of the planning and operational parameters. At the first stage, the algorithm determines the characteristics of energy system facilities for different stochastic parameter scenarios. At the second stage, the feasibility and optimality of AIMGs' electric transactions are evaluated and the optimal scheduling energy resources in normal states are determined. Finally, at the third stage, different demand response alternatives, load shedding and the AIMGs' electric transaction interruptions for contingent conditions are decided. The proposed method is applied to 9-bus, 33-bus and 123-bus IEEE test systems. Further, a full search algorithm is used to evaluate the quality of solutions of the proposed algorithm. The introduced algorithm reduced the total costs for the 9-bus, 33-bus and 123-bus system about 18.645%, 9.658%, and 4.849% with respect to the costs of custom expansion planning exercises, respectively.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据