4.7 Article

Optimal BIM staffing in construction projects using a queueing model

期刊

AUTOMATION IN CONSTRUCTION
卷 113, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2020.103123

关键词

BIM staffing; Queueing model; BIM RFIs; Waiting time; Waiting cost

资金

  1. Australian Government through the Australia-Korea Foundation of the Department of Foreign Affairs and Trade [AKF2018003]

向作者/读者索取更多资源

BIM staff plays the important role of providing required information from digital models to project participants. A dilemma is determining the appropriate capacity of BIM staff without sacrificing efficiency in terms of human resource costs. Despite the importance of BIM staffing, its effects on the productivity and performance of construction projects have rarely been investigated. This study presents a framework for quantifying the impact of BIM staffing. First, this study proposes a method to evaluate the activities of BIM staff by introducing a time-dependent queueing model. Second, the proposed framework is validated with data from three real-world projects in which BIM was applied. The effects of BIM staffing on the waiting time of project participants are quantitatively analyzed using time and cost indicators. The results show that decisions about optimal BIM staffing can be made by considering the waiting costs of project participants.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据