4.7 Article

Semi-dynamic maintenance scheduling for multi-station series systems in multi-specification and small-batch production

期刊

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2019.106753

关键词

Multi-station series system; Maintenance scheduling; Opportunistic maintenance; Maintenance time window; Multi-specification and small-batch

资金

  1. National Natural Science Foundation of China [51575356]

向作者/读者索取更多资源

This paper proposes a new semi-dynamic Opportunistic Maintenance (OM) policy for multi-station series systems, with considering the changing production environment brought by the multi-specification and small-batch production mode. It combines the advantages of the time-window-based OM policy, which can decrease the complexity of the solution space for PM grouping, and the dynamic OM policy, which is capable of adapting to the changing production environment. Whenever one of the stations reaches its original Preventive Maintenance (PM) moment, an OM decision cycle of the system begins. During this decision cycle, all the stations, whose original PM moments are within the presented dynamic Maintenance Time Window (MTW), form a PM group. This dynamic MTW is different for each station, and it is obtained based on the predetermined static MTW and the dynamic impacts from the current production task. The static MTW is constant, and it is derived according to the expected production plan without considering the changing production environment. To balance the maintenance cost for the obtained PM group, the PM is not performed right at the time when one of the stations reaches its original PM moment, and it is postponed. The optimal duration of the postponement is dynamically obtained by minimizing the total maintenance cost within this duration. Finally, numerical examples and comparisons are illustrated to show the effectiveness of the proposed semi-dynamic OM policy.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据