A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems

期刊

OR SPECTRUM
卷 42, 期 1, 页码 235-259

出版社

SPRINGER
DOI: 10.1007/s00291-020-00576-y

关键词

Emission control; Hydrothermal coordination; Power generation scheduling; Unit commitment problem

资金

  1. Projekt DEAL

向作者/读者索取更多资源

The paper describes a long-term scheduling problem for thermal power plants and energy storages. In addition, renewable energy sources are integrated by considering the residual demand. Besides the classical minimization of the production costs, emission-related costs are taken into account. Thereby, emission costs are determined by market prices for CO2 emission certificates (i.e., using the EU emissions trading system). For the proposed unit commitment problem with hydrothermal coordination for economic and emission control, an enhanced mixed-integer linear programming model is presented. Moreover, a new heuristic approach is developed, which consists of two solution stages. The heuristic first performs an isolated dispatching of thermal plants. Then, a re-optimization stage is included in order to embed activities of energy storages into the final solution schedule. The considered approach is able to find outstanding schedules for benchmark instances with a planning horizon of up to one year. Furthermore, promising results are also obtained for large-scale real-world electricity systems. For the German electricity market, the relationship of CO2 certificate prices and the optimal thermal dispatch is illustrated by a comprehensive sensitivity analysis.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据