Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects

期刊

KSCE JOURNAL OF CIVIL ENGINEERING
卷 24, 期 4, 页码 1029-1036

出版社

KOREAN SOCIETY OF CIVIL ENGINEERS-KSCE
DOI: 10.1007/s12205-020-1391-5

关键词

Cost overrun; Transmission lines; Construction; Vietnam

向作者/读者索取更多资源

Infrastructure projects are very essential in societies today because they enable the uninterrupted flow of goods, services, and information across any country. Although much research has been done to investigate cost overrun in different infrastructure projects such as transport, bridge, power plant, road, or even petroleum; little is known about what factors cause the most significant cost overrun in transmission lines construction projects. In order to fill this literature gap, the current study is aimed at identifying main cost overrun factors in these projects. A literature review is first conducted to capture causes of cost overrun in the construction industry. A survey questionnaire is then designed to collect data from transmission lines projects in Vietnam. Factor analysis is applied and seven factors of construction cost overrun are extracted including: risks, resources, incompetence of parties, firm policies, project policies, poor collaboration of parties, and components, transportation and machinery cost. A regression model is subsequently developed to assess the impact level of these seven factors on cost overrun. It is concluded that risks, resources, incompetence of parties, and components, transportation and machinery cost are the four main causes of cost overrun in transmission lines projects while the remaining factors are found to have no impact. The paper ends by pointing out limitations of the study and providing some suggestions for future research.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据