4.4 Article

Fuzzy distributed two-stage hybrid flow shop scheduling problem with setup time: collaborative variable search

期刊

JOURNAL OF INTELLIGENT & FUZZY SYSTEMS
卷 38, 期 3, 页码 3189-3199

出版社

IOS PRESS
DOI: 10.3233/JIFS-191175

关键词

collaborative variable search; fuzzy scheduling; distributed scheduling; two-stage hybrid flow shop; sequence-dependent setup times

资金

  1. National Natural Science Foundation of China [61573264]

向作者/读者索取更多资源

Distributed scheduling has attracted much attention in multiple factories. However, uncertainties are often neglected in the previous works and this neglecting may result in the low value of the obtained schedule. In this study, fuzzy distributed scheduling is addressed in two-stage hybrid flow shop with sequence-dependent setup times(SDST) which is a frequently studied constraint in single factory and seldom handled in multiple factories. A collaborative variable search (CVS) is proposed to optimize total agreement index and fuzzy makespan simultaneously. Seven neighborhood structures and two global search operators are used in two cooperated variable search parts to generate high quality solutions. Experiments are conducted and the computational results reveal that CVS has promising advantages on the considered fuzzy distributed scheduling problem.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据