4.6 Article

Rebaselining Asset Data for Existing Facilities and Infrastructure

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CP.1943-5487.0000868

关键词

Asset management; Existing buildings; Infrastructure; Asset data; Rebaselining; Technological requirements

资金

  1. University of Washington's Capital Projects Office and Sound Transit

向作者/读者索取更多资源

This paper introduces rebaselining as a workflow for collecting reliable and verifiable asset management data for existing facilities and infrastructure. Reporting on two action research case studies with two public owners in the US, this research structures rebaselining in four phases: (1) preparing technology enablers, (2) collecting data from existing documents, (3) conducting field verification, and (4) updating asset management databases. These workflows address some of the common challenges in managing existing assets, including the fast-paced changes in asset data requirements, the inaccuracies in data and documentation of these existing assets portfolios, and the need to update data and documents over their life cycle. The findings set the groundwork for implementing workflow by mapping the rebaselining business processes in each phase, listing the technological requirements for these processes, and explaining the feasibility and examples of customizing building information modeling (BIM) platforms for rebaselining workflows. This customization of BIM platforms aims to offer simplified solutions that reduce the facility management staff's need for advanced BIM software knowledge.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据