4.4 Article

Microgrid energy management: how uncertainty modelling impacts economic performance

期刊

IET GENERATION TRANSMISSION & DISTRIBUTION
卷 13, 期 24, 页码 5504-5510

出版社

INST ENGINEERING TECHNOLOGY-IET
DOI: 10.1049/iet-gtd.2019.0241

关键词

power markets; stochastic processes; distributed power generation; optimisation; pricing; energy management systems; rolling horizon operation scheduling; point price forecasts; real-life electricity market data; total energy costs; typical microgrid; stochastic optimisation models; robust optimisation models; deterministic optimisation models; generated forecasts; electricity market prices; scenario forecasting models; microgrid operators; economic values; scenario-based methods; interval optimisation; horizon optimisation techniques; economic gains; competitive electricity markets; grid-connected microgrids; optimal operation; key economic input; short-term electricity prices; economic performance; microgrid energy management

向作者/读者索取更多资源

Short-term electricity prices are key economic input to model the optimal operation of grid-connected microgrids. In competitive electricity markets, these prices are not known in advance, and need to be forecasted. Price forecasts, however, have uncertainty, and thus, their errors will impact economic gains. Three main approaches have been employed in the literature to mitigate the uncertainties associated with price forecasts, i.e. rolling horizon optimisation techniques, interval optimisation and scenario-based methods. In this study, we investigate the economic values of using these approaches, as well as the combination of them, in the operation of microgrids. This is to inform microgrid operators on how to determine which approach should be adopted under different circumstances. Therefore, we first implement point, interval and scenario forecasting models for electricity market prices. The generated forecasts are then fed into a deterministic, robust and stochastic optimisation models for operation scheduling of a typical microgrid. The changes in total energy costs of the microgrid are then evaluated. The simulation results show that while the performance of different methods depends on the volatility of market prices, the model with point price forecasts and a rolling horizon operation scheduling either outperforms other methods or does equally well.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据