Joint data center cooling and workload management: A thermal-aware approach

出版社

ELSEVIER
DOI: 10.1016/j.future.2019.10.040

关键词

Data center workload assignment; Cooling unit control; Thermal-aware scheduling; Thermal model; Data center power efficiency; Efficient cooling

资金

  1. Natural Science and Engineering Research Council of Canada (NSERC) [CRDPI506142-16]
  2. Cinnos Mission Critical Incorporated, Canada

向作者/读者索取更多资源

Information technology (IT) equipment and cooling infrastructure are key contributors to the total energy expenditure in a data center. There is typically significant power wastage due to inefficient cooling control and thermal-oblivious management of workload. Recent thermal-aware data center management techniques have not taken a unified approach in controlling IT and cooling systems. In this paper, we find that considering thermal effects of server workloads, in conjunction with control parameters of the cooling unit saves more power than optimizing each of them separately. We leverage a low complexity holistic data center model that considers thermal interactions between IT and cooling unit entities. This thermal model provides control decisions with fine-grained control variables. We propose joint cooling and workload management (JCWM), which has the potential to save a considerable amount of power by exploring synergies between the workload scheduler and operational parameters of the cooling unit. In addition, we provide a significant caveat for the power efficiency of server consolidation methods when taking into account associated thermal effects. (C) 2019 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据