4.7 Article

Influence of cement asphalt mortar debonding on the damage distribution and mechanical responses of CRTS I prefabricated slab

期刊

CONSTRUCTION AND BUILDING MATERIALS
卷 230, 期 -, 页码 -

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.conbuildmat.2019.116995

关键词

Prefabricated track slab; Debonding; Concrete Damaged Plasticity model; Shared passenger and freight railway service

资金

  1. National Natural Science Foundation of China [51578472, 51778543]

向作者/读者索取更多资源

The debonding between the prefabricated slab and CA mortar can result in very adverse effects on slab tracks, especially for shared passenger and freight railway services. We built a prefabricated slab track model based on the damage mechanics to research the effect of debonding on the concrete damage distribution and mechanical responses of prefabricated slabs. In this model, under various debonding cases, the upper surface damage distribution of the track slab near anchorages, vertical displacements of the slab end, and the maximum principle tensile stress of slab were calculated. The rail supporting forces tested in situ were employed as the train loads, which were measured by a Tekscan pressure measurement system. The results show that increasing the length and height of debonding can both promote the development speed and level of damage. Under the passenger train load, when the debonding extends to the 3rd anchorage with the height of 1.0 mm, completed damage appears on the slab surface. Meanwhile, the CA mortar void underneath the track slab can be formed, causing the displacement of the slab end not to rise with the increase of the debonding height. Under the freight train load, when debonding reaches to the 3rd anchorage, completed damage can also be obtained on the slab surface with debongding height of 0.8 mm. Furthermore, once this height exceeds 1.3 mm, the displacement change rate of the slab end rises as the debonding height increases once again, due to the generation of the second damaged zone. Considering the durability of slab track, once the size of debonding reaches the completed damage size for the prefabricated slab, the debonding should be repaired. (C) 2019 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据