期刊
PHYSICAL REVIEW ACCELERATORS AND BEAMS
卷 22, 期 10, 页码 -出版社
AMER PHYSICAL SOC
DOI: 10.1103/PhysRevAccelBeams.22.104002
关键词
-
Complementary to the physics research at the LHC, several fixed-target facilities receive beams from the LHC injector complex. To serve the fixed-target physics programme at the super proton synchrotron, high-intensity proton beams from the proton synchrotron are extracted using the multiturn extraction technique based on trapping parts of the beam in stable resonance islands. Considering the number of protons requested by future experimental fixed-target facilities, such as the proposed search for hidden particles experiment, the currently delivered beam intensities are insufficient. Experimental studies were conducted to optimize the multiturn extraction technique, pushing its capabilities in the domain of high-intensity proton beams, and their results are presented in this paper. The success of these studies led to the decision to discontinue the former continuous transfer and remove the related hardware from the accelerator. Therefore, the multiturn extraction becomes standard operational practice for delivering proton beams for the fixed-target physics programme at the CERN super proton synchrotron.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据