4.4 Article

A robust S2 control chart with Tukey's and MAD outlier detectors

期刊

出版社

WILEY
DOI: 10.1002/qre.2588

关键词

average of ARL (AARL); average run length (ARL); estimation effect; outlier detector; statistical process control

资金

  1. King Fahd University of Petroleum and Minerals [IN171010]

向作者/读者索取更多资源

Shewhart S-2 control chart is one of the most commonly used tools to monitor the dispersion of a process. In this article, we evaluate the performance of S-2 control chart when the unknown parameter is estimated from Phase-I samples. Average ARL and standard deviation of ARL metrics are used to evaluate the performance. In the first stage of the study, new control limit coefficients are derived so that the average ARL is equal to the pre-fixed ARL, ie, 370. Secondly, different proportion of outliers is contaminated into Phase-I samples, and the resulting elevated average ARL and standard deviation of ARL are measured. Finally, the application of Tukey's outlier detector is proposed with Phase-I samples so that the elevation caused by the outliers can be controlled and the average ARL can be pulled back close to the pre-fixed ARL. For illustration, the proposed procedures are applied to a data on compressive strength of parts manufactured by an injection molding process.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据