4.8 Article

Effect of sludge retention time on continuous-flow system with enhanced biological phosphorus removal granules at different COD loading

期刊

BIORESOURCE TECHNOLOGY
卷 219, 期 -, 页码 14-20

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.biortech.2016.07.093

关键词

Continuous-flow system; EBPR granules; Sludge retention; COD loading; High-throughput pyrosequencing

资金

  1. Trans-Century Training Programme Foundation for the Talents by the State Education Commission [NCET-10-0008]
  2. water project of National Science and Technology Major Project [2012ZX07202-005]

向作者/读者索取更多资源

The effect of sludge retention time (SRT) on the continuous-flow system with enhanced biological phosphorus removal (EBPR) granules at different COD loading was investigated during the operation of more than 220 days. And the results showed that when the system operated at long SRT (30 days) and low COD loading (200 mg.L-1), it could maintain excellent performance. However, long SRT and high COD loading (300 mg.L-1) deteriorated the settling ability of granules and the performance of system and resulted in the overgrowth of filamentous bacteria. Meanwhile, the transformation of poly-beta-hydroxyalkanoates (PHAs) and glycogen in metabolism process was inhibited. Moreover, the results of pyrosequencing indicated that filamentous bacteria had a competitive advantage over polyphosphate-accumulating organisms (PAOs) at high COD loading and long SRT. The PAOs specious of Candidatus_Accumlibater and system performance increased obviously when the SRT was reduced to 20 days at high COD loading. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据