'Coal-to-electricity' project is ongoing in north China

期刊

ENERGY
卷 191, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2019.116525

关键词

Heating; Coal; Electricity; Heat pump; PM2.5

资金

  1. General project of science and technology program of Beijing Education Committee [SQKM201810005011]
  2. Young Top -Notch Talents Team Program of Beijing Excellent Talents Funding [2017000026833TD02]

向作者/读者索取更多资源

The status of the Coal-to-Electricity project implemented on a large scale in North China was introduced, including the background, history, scale, etc. The main kinds of clean energy heater equipment used in the Coal-to-Electricity project were introduced, especially the structural type and working principle of air source water-loop heat pump were introduced and analyzed in detail. Data analysis of actual operation performance was also given. Finally, the methods used for project implementation and the problems encountered were summarized. (C) 2019 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据