4.7 Article

Towards accurate modeling of dynamic startup/shutdown and ramping processes of thermal units in unit commitment problems

期刊

ENERGY
卷 187, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2019.115891

关键词

Unit modeling; Unit commitment; Temperature evolution; Dynamic ramping; Forbidden zone

资金

  1. U.S. National Science Foundation [CMMI-1906780, CNS-1915756]

向作者/读者索取更多资源

The unit commitment problem is fundamental to the optimal operation of power systems, which is solved by Independent System Operators routinely in day-ahead markets to guarantee operational security and economics. Continuously enhancing the unit commitment model to improve modeling accuracy in response to future market challenges and participants' requests has always been one of Independent System Operators' main tasks, for deriving physically feasible and operationally reliable unit commitment and dispatch schedules that can render better economic efficiency. Thermal units account for 68% of the total installed electricity generation capacity and supply 63% of total electricity consumption in U.S.. Startup time of thermal units could vary from hours to days, and the corresponding startup cost could be 100 times different and as high as $500,000 per startup. To this end, this paper accurately accesses detailed startup and shutdown procedures of thermal units by simulating dynamic unit temperature evolution and modeling sequential unit operation stages. In addition, dynamic ramping and forbidden zones are also considered to further enhance the modeling accuracy. A modified IEEE 118-bus system is adopted to validate and evaluate the proposed models. (C) 2019 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据