4.7 Article

Multi-agent supply chain scheduling problem by considering resource allocation and transportation

期刊

COMPUTERS & INDUSTRIAL ENGINEERING
卷 137, 期 -, 页码 -

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2019.106003

关键词

Supply chain scheduling; Multi-agent problem; Resource allocation; Transportation; Batch delivery; Mathematical model

向作者/读者索取更多资源

Today in the global market competition, integration issue in supply chain is considered as an important principle. In this study, for the first time, different requirements of the customers and different aims of the manufacturer are simultaneously addressed in an integrated problem of production scheduling, transportation, and resource allocation. The problem consists of two types of customers, considered as the agents. The first agent accepts tardiness in delivery of orders provided that the manufacturer pays the tardiness penalty; whereas, the second agent does not accept the tardy orders. The purpose is to minimize the sum of batch delivery cost, resource allocation, tardiness penalty cost, and lost sale cost (the total number of tardy orders). To solve the problem, two mathematical programming models, including a Mixed Integer Non-Linear Programming (MINLP) and a Mixed Integer Linear Programming (MILP) are proposed. Also, due to NP-hard nature of the problem, two meta-heuristic algorithms of Adaptive Genetic Algorithm (AGA) and Ant Lion Optimization (ALO), as well as a heuristic algorithm are proposed. To assess the merits of the solution methods, small and large-scale tests are designed. The results indicate the superiority of adaptive genetic algorithm in comparison with other algorithms.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据