Hybrid power plant; Optimal sizing; Techno-economic study; Sensitivity analysis; Energy Management Strategies
资金
- Horizon 2020 project TILOS [H2020 - LCE -2014-3 - LCE - 08/2014-646529]
- European Union
- Corsican Collectivity
When sizing a renewable energy power plant in a grid-connected scenario, the optimal solution depends on the energy exchange rates between the actors of the electrical network. This study presents an optimization method that can be adapted to various power plant configurations to obtain the best size for each component, depending on the weather and the consumption. The optimization problem is solved in two steps. A Multi-Objective Particle Swarm Optimizer gives the trade-off between the cost of the components and the amount of non-renewable energy used, then the posttreatment takes into account the energy exchange tariffs and presents the solutions that minimize the production cost for any import and export rates. Those results can be used to evaluate the feasibility of an installation or to define the exchange tariffs with the grid regulation entity. This study also showcases the effect of the economic assumptions and of the choice of the energy management strategy on the optimal solution. The results show that the variation of the optimal production cost is limited but the component size has to be adapted accordingly. In the same way, the Energy Management Strategy used influences the plant design without affecting significantly the production cost.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据