期刊
AUTOMATION IN CONSTRUCTION
卷 72, 期 -, 页码 397-410出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2016.10.005
关键词
Building information modeling; Progress curves; Quantity takeoffs; Scheduling activity cost
资金
- Ministry of Science and Technology of Taiwan [MOST 103-2622-E-009-022-CC3]
A cost-based progress curve (called S-curve) is often used to control construction project schedules. To establish a progress curve, the costs that are associated with each scheduling activity must be determined. However, the distributions of the quantities (costs) of cost items among various activities are time-consuming to obtain and error prone, yielding an unreliable S-curve. This work proposes the use of three-dimensional building information model (BIM) objects to integrate schedule and cost by using the powerful BIM for data acquisition and storage. BIM objects are incorporated into a proposed four-step model to establish construction progress curves. The proposed model defines search criteria (cost item, object, floor, and zone) that precisely identify takeoff objects for extracting the quantities of cost items associated with each activity. The BIM uses keynote, assembly code, and family type catalog functions to provide pop-up menus for the efficient identification of cost items that are associated with each object to preventing errors in the manual typing of cost-item names. Finally, this work demonstrates that uploading the cost items and unit prices into cost estimation software in advance is critical to automating cost estimations in BIM. (C) 2016 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据