An Extended PROMETHEE-II-Based Risk Prioritization Method for Equipment Failures in the Geothermal Power Plant

期刊

INTERNATIONAL JOURNAL OF FUZZY SYSTEMS
卷 21, 期 8, 页码 2490-2509

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s40815-019-00679-x

关键词

Failure mode and effect analysis; PROMETHEE-II; Risk prioritization; Z-number; Bonferroni mean operator

向作者/读者索取更多资源

The equipment failure is an important factor that may cause accidents in the geothermal power plant. Failure mode and effect analysis (FMEA) has been widely adopted to prevent potential failures in various process enterprises. However, current FMEA models are inefficient to determine risk priority by considering the risk preference and reliability of expert within the context of interaction among risk factors. To overcome this shortcoming, this paper develops a hybrid risk prioritization method by integrating PROMETHEE-II method, Bonferroni mean operator and linguistic Z-number. Firstly, the linguistic Z-number is utilized to depict the reliability and uncertainty of experts. Then, the linguistic Z-number ordered weighted averaging operator is developed to aggregate the risk evaluation information from experts, which can reflect the actual performance of experts. In addition, the extended PROMETHEE-II method with distance-based weighting method and Bonferroni mean operator is proposed to calculate the risk priority, in which the interactions among risk factors and risk preference of expert are considered. Finally, the risk analysis of equipment failures in the geothermal power plant is selected to illustrate the proposed method. The comparison and sensitivity analyses are conducted to further validate its effectiveness.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据