4.7 Article

Preventive Maintenance Subject to Equipment Unavailability

期刊

IEEE TRANSACTIONS ON RELIABILITY
卷 68, 期 3, 页码 1009-1020

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TR.2019.2913331

关键词

Age-based preventive maintenance (PM); condition-based maintenance (CBM); equipment unavailability; maintenance rescheduling

资金

  1. U.S. National Science Foundation [1855408]
  2. Directorate For Engineering
  3. Div Of Civil, Mechanical, & Manufact Inn [1855408] Funding Source: National Science Foundation

向作者/读者索取更多资源

Preventive maintenance has received considerable attention in industries and the literature. Conventional preventive maintenance models often assume that equipment is always available for maintenance activities. However, in many mission-critical industries, equipment may not be available for scheduled maintenance due to busy operational schedules. Forced shutdown of the equipment may incur extra costs that cannot be offset by the benefits from preventively maintaining the equipment. In this paper, we propose innovative preventive maintenance policies to address the challenges caused by equipment unavailability. Maintenance models with possible rescheduling are developed for both time-based and condition-based maintenance policies, and the objective is to minimize the long-run cost rate of all maintenance activities. The proposed policies, with consideration of equipment unavailability for prescheduled PM, are compared with the policies that ignore this unavailability. Numerical examples are provided to illustrate the proposed policies.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据