4.5 Article

Allocation of effective maintenance limit for railway track geometry

期刊

STRUCTURE AND INFRASTRUCTURE ENGINEERING
卷 15, 期 12, 页码 1597-1612

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/15732479.2019.1629464

关键词

Maintenance limit; track geometry; maintenance; degradation; Monte Carlo simulation; ordinal logistic regression

资金

  1. Swedish Transport Administration (Trafikverket)
  2. Lulea Railway Research Center (JVTC)
  3. Bana Vag For Framtiden (BVFF)

向作者/读者索取更多资源

The objective of this study has been to develop an approach to the allocation of an effective maintenance limit for track geometry maintenance that leads to a minimisation of the total annual maintenance cost. A cost model was developed by considering the cost associated with inspection, preventive maintenance, normal corrective maintenance and emergency corrective maintenance. The standard deviation and extreme values of isolated defects of the longitudinal level were used as quality indicators for preventive and corrective maintenance activities. The Monte Carlo technique was used to simulate the track geometry behaviour under different maintenance limit scenarios and the effective limit was determined which minimises the total maintenance cost. The applicability of the model was tested in a case study on the Main Western Line in Sweden. Finally, a sensitivity analysis was carried out on the inspection intervals, the emergency corrective maintenance cost and the maintenance response time. The results show that there is an optimal region for selecting an effective limit. However, by considering the safety aspects in track geometry maintenance planning, it is suggested that the lower bound of the optimal region should be selected.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据