4.7 Article

Distribution System Expansion Planning Considering Non-Utility-Owned DG and an Independent Distribution System Operator

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 34, 期 4, 页码 2588-2597

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2019.2897869

关键词

Distribution system expansion planning; independent distribution system operator (IDSO); non-utility-owned distributed generation; transactive energy; trilevel programming

资金

  1. Ministry of Economy and Competitiveness of Spain [ENE2015-63879-R]

向作者/读者索取更多资源

This paper addresses the multistage or dynamic investment decision-making problem arising in a distribution system within a transactive energy environment. Under such a framework, three agents are involved, namely the distribution company (DISCO), the owner of distributed generation (DG) units (DGENCO), and the independent distribution system operator (IDSO). Here, we propose characterizing this planning problem as an instance of trilevel programming. In the upper level, the DISCO identifies the optimal investment plan in network assets and the best potential locations for DG in order to supply the customer demand at maximum profit. In the middle level, the DGENCO determines the best location, sizing, and timing for DG installation so that the corresponding profit is maximized. Finally, in the lower level, the IDSO is responsible for the optimal operation of the expanded distribution system. The resulting mixed-integer trilevel program is solved by a novel approach relying on Benders decomposition. The performance of the proposed approach has been illustrated with a case study based on a 37-node test system.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据