4.7 Article

Box-Based Temporal Decomposition of Multi-Period Economic Dispatch for Two-Stage Robust Unit Commitment

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 34, 期 4, 页码 3109-3118

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2019.2896349

关键词

Cut generation algorithm; multi-period economic dispatch (ED); non-anticipativity; robust unit commitment (UC)

资金

  1. JST CREST [JPMJCR15K1]

向作者/读者索取更多资源

To ensure the feasibility of a unit commitment (UC) schedule under uncertainty, most existing two-stage robust UC methods formulate their second-stage problems as a multi-period economic dispatch (ED) problem with dynamic constraints, which does not properly model real-time ED where dynamic constraints relevant to the future operation are not certifiable. This paper proposes a two-stage robust UC method where a UC schedule and a box in a feasible operation set of each power source as its new feasible operation set are determined. As the multi-period ED problem with the refined feasible set at the second stage has no dynamic constraint, it is identical to a series of single-period ED problems. By modeling real-time ED as the single-period ED problems whose solutions depend only on uncertainties at the corresponding times-lots, the proposed method presents a practical framework of nonanticipative robust UC. Simulation results with a 118-bus system demonstrate the performance of the proposed method.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据