期刊
APPLIED ENERGY
卷 178, 期 -, 页码 647-659出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2016.06.021
关键词
Electric vehicle charging stations; Planning; Traffic flow; Load capability; Load profile templates
资金
- National Science Foundation of China [51377111]
- EPSRC [EP/M000141/1] Funding Source: UKRI
- Engineering and Physical Sciences Research Council [EP/M000141/1] Funding Source: researchfish
This paper develops a novel solution to integrate electric vehicles and optimally determine the siting and sizing of charging stations (CSs), considering the interactions between power and transportation industries. Firstly, the origin-destination (OD) traffic flow data is optimally assigned to the transportation network, which is then utilized to determine the capacity of charging stations. Secondly, the charging demand of charging infrastructures is integrated into a cost-based model to evaluate the economics of candidate plans. Furthermore, load capability constraints are proposed to evaluate whether the candidate CSs deployment and tie line plans could be adopted. Different scenarios generated by load profile templates are innovatively integrated into the economic planning model to deal with uncertain operational states. The models and framework are demonstrated and verified by a test case, which offers a perspective for effectively realizing optimal planning of the CSs considering the constraints from both transportation and distribution networks. (C) 2016 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据