4.7 Article

Group maintenance scheduling for two-component systems with failure interaction

期刊

APPLIED MATHEMATICAL MODELLING
卷 71, 期 -, 页码 118-137

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.apm.2019.01.036

关键词

Maintenance; Multi-component system; Failure interaction; Scheduled window; Cost optimization

资金

  1. National Natural Science Foundation of China [61473014]

向作者/读者索取更多资源

Failure dependence is a common phenomenon in complex and large-scale industrial plants, which may cause tremendous economic losses and unacceptable safety risks. This paper investigates an advanced group and opportunistic maintenance policy for a two-component system with failure interaction. The interaction between soft and hard failures is characterized by random hazard rate increments, with fully consideration of environmental uncertainties. To sufficiently utilize the economic dependence between components, Scheduled maintenance windows are equally spaced for group maintenance of the whole system. Whenever a component is replaced at a maintenance window, the other one is also opportunistically replaced. Furthermore, failure of component 2 is removed by minimal repair, whereas replacement is left to the subsequent window. The objective is to jointly optimize the maintenance interval and the number of maintenance windows via the artificial bee colony algorithm. A case study on an electrical distribution system is provided to validate the applicability of the adopted policy. (C) 2019 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据