4.4 Article

Discrete Element Modeling of Full-Scale Ballasted Track Dynamic Responses from an Innovative High-Speed Rail Testing Facility

期刊

TRANSPORTATION RESEARCH RECORD
卷 2673, 期 9, 页码 107-116

出版社

SAGE PUBLICATIONS INC
DOI: 10.1177/0361198119846475

关键词

-

资金

  1. ZJU-UIUC Institute research program
  2. ZJU

向作者/读者索取更多资源

To achieve increased rail network safety and reliability, it is important to better understand ballast layer performance under complex and demanding dynamic loading field scenarios, especially for high speed lines on ballasted track. Repeated high-speed loading tests were recently conducted at three train speeds on a full-scale ballasted track-subgrade system, known as the Zhejiang University innovative high-speed rail tester (ZJU-iHSRT). BLOKS3D, a polyhedral discrete element method (DEM) particle simulation code with newly featured parallel computing capability, was used to capture the full-scale ballasted track dynamic responses at those speeds. A proportional-integral-derivative controller was also implemented in the DEM code to ensure identical dynamic loadings were applied in the DEM model as in the physical model. This paper presents the dynamic response findings obtained using the DEM model: 1) Crosstie vibration velocities captured in the DEM model match closely with the measurement obtained from the same crosstie in the physical model; 2) ballast particle vibration velocities recorded in the DEM model provide an overall good match with the data measured from the same location in the physical model; and finally, 3) visualized macroscopic ballast layer dynamic responses reveal the mechanical behavior of the ballast layer under dynamic loading scenarios applied in the ZJU-iHSRT full-scale ballasted track-subgrade system.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据