4.5 Article

Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)CO.1943-7862.0001654

关键词

Just-in-time in construction; Lean in construction; Prefabrication; Simulation

资金

  1. Natural Sciences and Engineering Research Council of Canada through the ICP program [IRCPJ 461745-12, RDCPJ 445200-12]
  2. Natural Sciences and Engineering Research Council of Canada through the CRD program [IRCPJ 461745-12, RDCPJ 445200-12]

向作者/读者索取更多资源

The construction industry is always searching for better ways to manage construction projects and improve productivity while leaving a smaller ecological footprint. To help with this goal, a simulation model was developed in a 3D simulation modeling framework to examine the impact of successful concepts from the manufacturing industry, such as just-in-time (JIT) deliveries, Lean tools, and prefabrication in construction. The model developed was based on a real 6-story wooden building erected in the province of Quebec, Canada. Through a design of experiment, results of the simulation showed the impact of each concept and their interactions on the construction duration, shortages, and labor utilization. They also put into light the quantitative advantages and disadvantages of implementing 0%, 50%, or 100% Lean management methods, keeping between 1 and 4 days of buffer stock on the construction site, having 80% or 100% prefabrication of components, and using 1 or 2 construction teams. As a result, this paper contributes to the work of scholars and practitioners by simulating a real construction project to assess the impact of prefabrication, JIT, and Lean principles with tangible metrics, construction duration, shortages, and labor utilization.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据