4.7 Article

Distribution Network Expansion Planning Considering N-1 Criterion

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 34, 期 3, 页码 2476-2478

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2019.2896841

关键词

Distribution expansion planning; N-1 criterion; contingency analysis

资金

  1. National Key Research and Development Program [2016YFB0900100]

向作者/读者索取更多资源

Real distribution systems are usually operated in open loop, but designed in closed loop to be capable of load transfer under contingencies. This letter proposes an approach for distribution network expansion planning problem under N - 1 criterion, which presents both optimal closed-loop investment and open-loop operation plans. To alleviate the computational burden of the model, constraints for N - 1 criterion are first relaxed and thereafter the problem is solved with iteratively added binding contingency constraints, which are identified by a designed method. The proposed methodology is validated with numerical experiments on a 138-node test system.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据