4.7 Article

Characteristics and runout behaviour of the disastrous 28 August 2017 rock avalanche in Nayong, Guizhou, China

期刊

ENGINEERING GEOLOGY
卷 259, 期 -, 页码 -

出版社

ELSEVIER
DOI: 10.1016/j.enggeo.2019.105154

关键词

Rock avalanche; Nayong landslide; DAN3D model; Seismic signal; Dynamic analysis

资金

  1. National Key R&D Program of China [2018YFC1504804]
  2. Guizhou Science and Technology Project [[2017]5402, [2017]2814]

向作者/读者索取更多资源

On 28th August 2017, a disastrous rock avalanche occurred in Nayong, Guizhou, China. This catastrophic event killed 35 people and destroyed 23 houses. In this study, the failure process of the avalanche was analyzed using UAV video footage and seismic signal recordings obtained for the pre- and post-failure stages of the landslide. To better understand the possible mechanism of the avalanche and its dynamic characteristics, a numerical simulation was conducted using a dynamic model (DAN3D) to simulate the runout behaviour of the displaced materials. Simulated results indicate that the failure process of the Nayong rock avalanche lasted approximately 30 s; the duration of the failure process is close to that from the UAV video footage and seismic signal recordings (35 s). The duration of movement during the landslide process is estimated to be approximately 90 s with a maximum velocity of 40 m/s. The combined frictional-Voellmy model delivered the most accurate results when simulating this event. The selected models and parameters are expected to aid in clarifying the propagation processes of similar rock avalanches and thus improve the accuracy of hazard prediction in mountainous karst areas.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据